© Copyright 2003 Rachel
Ford
Makeover 2003
page 5
.....more
work going on
Touched up paintwork everywhere, including roof brackets.
Modified
R&R bed, a sheet of MDF attached which will hinge forward therefore we are
able to sleep further down the van. (Don't have to empty the boot area to go
to bed!)
Carpet and newly covered cushions go in.
Sink/fridge unit is put back. We built it from MDF copying
the origional design size. It was painted then sealed, an edging strip put
around the work surfaces to prevent things rolling off.
With the seats put back and all the cushions in place we
have made an L-shaped sofa arrangement. The seat under the window has a lift
up lid but also opens from the front.
Under dash area is yet to be finished. We have found a few
leaks so we need to get them sorted before upholstering.